Project
The construction of Central Station, terminus for the express link
from Hong Kong to the new Chep Lap Lok airport, required a 15m deep
excavation in reclaimed land. This was to have been braced but temporary
anchoring offered improved working space and was economically viable.
Soil
Conditions
Ground information for the site showed the excavation to be in medium,
dense marine sands , underlain by completely decomposed granite.
Solution
AOKI investigated the use of anchor systems knowing the benefits that an open cut could offer to unhindered access for the construction of the four RC tunnels required by MTR.This section immediately followed the submerged segment Victoria Harbour Tunnel. The main works involved the design, drilling, installation, stressing
and removal of 460 No. SBMA anchors up to 67m long. Using 5 rows
of anchors the top two rows, founded in the marine sands had working
loads of up to 1400kN and the lower three rows, founded in very dense silt,
had working loads of 2000kN.
Preliminary
testing demonstrated that loads up to 3000kN were achievable.
Construction
Up to 5 No. drill rigs using duplex drilling techniques produced
the average 39m long hole for installation of the multiple-strand
anchors which were stressed using specially developed twin strand
multi-jack stressing heads.
The open excavation allowed by the anchor solution enabled the RC tunnels in this section to be completed 4 months ahead of those sections where struts were employed.
Wall movement amounted to less than half that predicted. The anchors were removed during the next 6 months in co-ordination with the permanent construction.
| Client |
Mass
Transit Railway Corporation |
| Engineer
|
Robert
Benaim & Associates |
| Main
Contractor |
Aoki
Corporation |
| Specialist
Sub-contractor |
Austress
Freysinnet Freysinnet Hong Kong JV |
|